Subject: MT"CHEM" VOY 08.22, AT BND ANCHORAGE TO DISCHARGE AROUND 7 KT CONDENSTAE OF 4TH PARCEL / COMMENCE DISCHARGE From: "RAMESH " Date: 30/06/2022, 03:03 To: CC: "'Ops.Arsang'" , , Good day, Please find update report of the vsl at B.Abbas anchorage for 4TH parcel discharge as below: 28.06.2022 1600 hrs lt Nor tendered 1642 hrs lt Drop anchor 1836 hrs lt Bunker barge alongside 1948 hrs lt Bunker hose connected 1954 hrs lt Commence bunkering 2218 hrs lt Complete bunkering 29.06.2022 1412 hrs lt Water barge alongside 1524 hrs lt Water barge cast off 30.06.2022 0812 hrs lt Anchor up 0954 hrs lt Pob 1012/1018 Tug made fast 1036 hrs lt First line 1048 hrs lt Tug cast off 1048 hrs lt All made fast 1054 hrs lt Pilot off 1054 hrs lt Gangway ready 1054 hrs lt Surveyor on board 1200/1330 Tanks measurement 1400 hrs lt Calculation over 1336 hrs lt Hose connected 1418 hrs lt Commence discharge Reverting Best Regards Ramesh Aflakian (Mr.) Ops Manager Asia Marine Crown Agency (AMC) Apt. 7 , 1st floor, South wing , Bldg. No.21,Kar Va Tejarat St., Vanak Sq,Tehran 1991943845, Iran Tel: +98 21 86 08 04 31 +98 21 86 08 36 90 Cell:+98 912 385 9771 cid:image002.jpg@01D854B8.58C12C00