Subject: RE: MT"CHEM" CALLING AT BND TO LOAD AROUND CONDENSTAE / STS OPERATION COORDINATION //// Timings - Update4 From: Dune Date: 02/01/2023, 12:14 To: "'operation'" , "'ebadi'" , "'RAMESH'" CC: , , "'RAMESH'" , "'Nezami'" , Dear Sir , Pls note followings: AA)) Timings: 01/01/2023 0748 1st line on the bit 0906 All made fast 0954 Comm. Hose Connection 1300 Compl. Hose Connection 2136 commence discharging 02/01/2023 1418 stopped as per daughter vessel request 1542 resumed discharging 1824 Compl. Discharging 2000 Comm. Tank Inspection 2042 Compl. Tank inspection 2042 Comm. Calculation 2100 Compl. Calculation 2042 Comm. Hose disconnection 2100 Comp. Hose disconnection 2300 Comm. Unmooring 2312 All cleared BB)) Attached pls find scaned cargo documents CC)) pls note , SOF/LOPs/pumping log/….are not signed by the surveyor nor daughter vessel. As per the surveyor , a representative will board the vessel later and will sign all the cargo documents together. Best Regards Master MT.DUNE E-Mail: dune@otslc.com Attachments: Chem - 01-02.01.2023.pdf 3.9 MB