Subject: MT"CHEM" CALLING AT BND TO LOAD AROUND CONDENSTAE / STS OPERATION ///// STS with Chem on 15-16/01/2023 From: Dune Date: 16/01/2023, 02:24 To: "'operation'" , "'ebadi'" , "'RAMESH'" CC: , , "'RAMESH'" , "'Nezami'" , Dear Sir , Pls note followings: AA))Timings 15/01/2023 1436 Comm. Mooring 1442 1st line on the bit 1512 All made fast 1524 Comm. Hose connection 1642 Compl. Hose connection 1742 Comm. discharging 16/01/2022 1006 Compl. Discharging 1118 Comm. Tank Inspection 1154 Compl. Tank inspection 1154 Comm. Calculation 1230 Compl. Calculation 1012 Comm. Hose disconnection 1154 Comp. Hose disconnection 1236 Comm. Unmooring 1254 All cleared BB)) Attached pls find scanned cargo documents CC)) pls note , SOF/LOPs/pumping log/….are not signed by the surveyor nor daughter vessel. As per the surveyor , a representative will board the vessel later and will sign all the cargo documents together. DD)) Your attention is drown to page 6 and 7 of the attached file in pdf which are LOPs issued by vessel. EE)) Dich. Qtty in this STS Operation – 15-16/01/2023 Tot. Discharge in this STS Operation : BBL 68,943 BBLS GSV MT 8,011 Present ROB : BBL 1,868,487 GSV MT 217,118 Best Regards Master MT.DUNE E-Mail: dune@otslc.com Attachments: STS - 15-16-01-2023.pdf 4.1 MB