Subject: RE: Dune: disch 700 K.Bbls ILCO& 80 K.Bbls SPC to Cathay Phoenix - From: "Dune" Date: 30/11/2023, 03:45 To: "'operation'" CC: , , , , Dear Sir Good Day Ref yr kind b/m pls find attached stowage plan showing loaded 3 parcels fm 3 DVs separately in center tanks in red group segregation. Blue and yellow group including bottom line , top line and pumps containing 65% of total capacity would remain intact. both blue and red groups are dedicated to clean cgo of SPC. Strongly recommend to load each parcel from each vsl separately in a center tank as per proposed stowage plan for precise cago measurements. As far as blending of received cargo is concerned, Dune would be able to discharge rcvd 3 grades simultaneously as per volumetric percentage, Therefore rcvin vsl would be rcving blended cgo as if it was mixed in Dune thanks. Need to mention combination of total rcvd cgo of 3 vsls cannot be capacitated in single tank. Internal transfer and blending on board is not recommend. Best Regards Master MT.Dune E-Mail: dune@netvslplus.com From: operation [mailto:operation@saharathunder.com] Sent: Thursday, November 30, 2023 10:44 AM To: Dune Cc: ebadi@ptsoc.com; mo-fathi@ptsoc.com; nezami@ptsoc.com; a-akbari@ptsoc.com; operation@saharathunder.com; ops3@blueoilco.com Subject: Re: Dune: disch 700 K.Bbls ILCO& 80 K.Bbls SPC to Cathay Phoenix - DISCH UPDATE 30.11.2023/0600 Dear Captain, Ref. to below quantity and the density submitted by Blue oil and my earlier statement please advise the possibility and practical plan. Best Regards, Operation Sahara Thunder -------- Original message -------- From: ops3@blueoilco.com Date: 11/30/23 10:38 (GMT+03:30) To: operation Cc: Dune , ebadi@ptsoc.com, mo-fathi@ptsoc.com, nezami@ptsoc.com, a-akbari@ptsoc.com Subject: Re: Dune: disch 700 K.Bbls ILCO& 80 K.Bbls SPC to Cathay Phoenix - DISCH UPDATE 30.11.2023/0600 Dear Sir, Please be informed as below MT Argo QTY : 8429 MT Density :7080 API:68.58 MT Beauty QTY : 10236 MT Density: 0.966 (4782 MT-0.700 and 5455MT 0.966) API:14.89 MT: Harmony QTY: 9800MT Density: 0.968 API:13.99 Best regards Heidari On 2023-11-30 10:01, operation wrote: > Dear Mrs. Heidari, > > Ref. to your below message please revert with cargo quantity a d the > API for each step. > As the vessel has 3 seg. only, which one of them presently occupied by > condensate, we shall check and find that whether your plan is > possible/practical or not. > > Dear Captain, > > After receiving the quantity and the API for each cargo and also based > on ship available segration and your expertise please advise the > possibility of below request and revert with your suggestion > > Best Regards, > Operation > Sahara Thunder > > -------- Original message -------- > From: ops3@blueoilco.com > Date: 11/30/23 08:12 (GMT+03:30) > To: Dune > Cc: 'operation' , ebadi@ptsoc.com, > mo-fathi@ptsoc.com, nezami@ptsoc.com, a-akbari@ptsoc.com > Subject: Re: Dune: disch 700 K.Bbls ILCO& 80 K.Bbls SPC to Cathay > Phoenix - DISCH UPDATE 30.11.2023/0600 > > Dear Sir, > > Due to there is a big difference between the density of the crude oil > sample and the cargo on the Dune, so after complete discharge crude > oil > into Cathay Phoenix the plan will be as follows > > 1-Beauty must be discharged in a tank with about 29k space separately > 2- Mt Argo will be discharged into Dune in a separate tank > 3- Mt Harmony should be discharged into separate tank > 4-In this step, cargoes related to steps 2 and 3 should be transfered > to > the tank related to step 1 at the same time and same rate > 5- After blending, all cargoes in steps 1 to 4 must be discharged in > > Cathay Phoenix > 6- Finally, condensate on Dune must be discharged into Cathay Phoenix > > If you have any question please dont hesitate to call me anytime > > Best regards > Heidari > > On 2023-11-30 07:53, Dune wrote: >> Dear ALL >> >> Good day >> >> Wrt sub ops pls note flwng DISCHARG UPDATE : >> >> TOTAL DISCH ILCO : >> >> 451,389 BBL GSV >> >> 60,888 M.T >> >> 71,765 CU.M GSV >> >> RATE:5,447 CU.M/HR >> >> ROB: >> >> 233,536 BBL GSV >> >> 31,502 M.T >> >> 37,111 CU.M GSV >> >> E.T.C ILCO:30.11.2023/1800HRS >> >> Best Regards >> >> Master MT.Dune >> >> E-Mail: dune@netvslplus.com Attachments: DUNE STOWAGE PLAN.XLSX 24.0 KB